logo

Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1 GW) under Phase-II, Part D

Sector: Power Generation (CCGT) • Location: India

Source: T&D India

Project
Completed

This project is part of the transmission system strengthening for solar energy zones in Rajasthan, covering 514 ckm of infrastructure with an estimated cost of Rs.1,516 crore.

Status
Closed
Sector
Power Generation (CCGT), Solar
Location
India
Updated
22 Jul 2026
Source
T&D India

ConstructChat

Ask ConstructChat about Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1 GW) under Phase-II, Part D

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1 GW) under Phase-II, Part D” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from T&D India.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is part of the transmission system strengthening for solar energy zones in Rajasthan, covering 514 ckm of infrastructure with an estimated cost of Rs.1,516 crore.

Original sector

Energy

Budget

Location

Country

India

Source

Source

T&D India

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-01-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project