Transmission system strengthening to facilitate evacuation of power from Bhadla/Bikaner complex
Sector: Power Generation (CCGT) • Location: India
Source: Dalal Street Investment Journal (DSIJ)
This project aims to strengthen the transmission system to facilitate the evacuation of power from the Bhadla/Bikaner complex, with an estimated cost of Rs 212.81 Crore and a target completion date of June 9, 2026.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Road
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Dalal Street Investment Journal (DSIJ)
ConstructChat
Ask ConstructChat about Transmission system strengthening to facilitate evacuation of power from Bhadla/Bikaner complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project aims to strengthen the transmission system to facilitate the evacuation of power from the Bhadla/Bikaner complex, with an estimated cost of Rs 212.81 Crore and a target completion date of June 9, 2026. |
Original sector | Power Transmission |
Budget |
Location
Country | India |
Source
Source | Dalal Street Investment Journal (DSIJ) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road |
Article published date | 2025-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
