logo

Transmission system strengthening to facilitate evacuation of power from Bhadla/Bikaner complex

Planned · India · Last reported May 2025

Source: Dalal Street Investment Journal (DSIJ)

Project
Planned

This project aims to strengthen the transmission system to facilitate the evacuation of power from the Bhadla/Bikaner complex, with an estimated cost of Rs 212.81 Crore and a target completion date of June 9, 2026.

Status
Prospective
Sector
Road, Power Generation (CCGT)
Location
India
Updated
22 Jul 2026
Source
Dalal Street Investment Journal (DSIJ)

ConstructChat

Ask ConstructChat about Transmission system strengthening to facilitate evacuation of power from Bhadla/Bikaner complex

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Transmission system strengthening to facilitate evacuation of power from Bhadla/Bikaner complex” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from Dalal Street Investment Journal (DSIJ).

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project aims to strengthen the transmission system to facilitate the evacuation of power from the Bhadla/Bikaner complex, with an estimated cost of Rs 212.81 Crore and a target completion date of June 9, 2026.

Original sector

Power Transmission

Budget

Location

Country

India

Source

Source

Dalal Street Investment Journal (DSIJ)

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT)

Article published date

2025-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project