Transmissora Matogrossense de Energia

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In November 2009, the Brazilian company Consorcio Jauru-Cuiaba, was awarded in a competitive bidding process the contract to build and operate a 348-km transmission line and one substations located in the state of Mato Grosso. Consorcio Jauru-Cuiaba was established as a joint venture of the state-owned Eletronorte - Centrais Eletricas do Norte (49%); the Brazilian company Alupar Investimentos S/A

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Transmissora Matogrossense de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Transmissora Matogrossense de Energia” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In November 2009, the Brazilian company Consorcio Jauru-Cuiaba, was awarded in a competitive bidding process the contract to build and operate a 348-km transmission line and one substations located in the state of Mato Grosso. Consorcio Jauru-Cuiaba was established as a joint venture of the state-owned Eletronorte - Centrais Eletricas do Norte (49%); the Brazilian company Alupar Investimentos S/A (31%), formerly known as Alusa; the Brazilian company Bimetal Indústria Metalúrgica Ltda. (15%); and the Colombian company ISA's subsidiary CTEEP-Companhia deTransmissao de Energia Eletrica Paulista (5%). Besides Consorcio Jauru-Cuiaba, other companies took part in the contest: COBRA INSTALACIONES Y SERVICIOS S.A. (Spain); CYMI HOLDING S.A. (Spain); ORTENG EQUIPAMENTOS E SISTEMAS LTDA (Brazil); and ISOLUX INGENIERIA S.A. (Spain). The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Jauru-Cuiba presented the lowest offer, a total value of US$ 13.9 million (BRL 27.52 million), 30 % below the ceiling set by the regulatory agency. The contract was signed in May 2009, and the sponsors created the company Transmissora Matogrossense de Energia S.A. Environmental clearance was awarded in July 2010, and the construction works started right away. Commercial operations commenced in November 2011. The sponsor committed to invest US$ 125.3 million (BRL 247.50 million) in the electric complex. In February 2012, the sponsors were granted a US$ 44.2 million ( BRL 87.30 million) loan from state-owned bank BNDES. The remaining cost was set to be financed with the sponsors' internal resources. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2024-06-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project