logo

Transpa SA

One of 408 projects Taiyo tracks in Santiago del Estero.

Source: World Bank Group

Project
Distressed

The company was partially privatized in June 1994 when the government sold a 51% equity stake for $20.8 million to Aluminio Argentino SAIC (Aluar) (20.4%), Camuzzi Gazometri SpA. (12.75%), Grupo CG Argentina (7.65%%), and seven other groups (each holding less than 4%). Only $1 million was paid in cash and the remaining $19.8 million were paid in debt papers.

In 2003, Camuzzi filed a claim again

Status
Failure
Sector
Forest Products and Packaging, Water Supply and Storage, Power Generation (CCGT), Government, Commercial
Location
Santiago del Estero, Argentina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Transpa SA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Transpa SA” is an infrastructure initiative in the Forest Products and Packaging sector, located in Santiago del Estero, Argentina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Distressed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The company was partially privatized in June 1994 when the government sold a 51% equity stake for $20.8 million to Aluminio Argentino SAIC (Aluar) (20.4%), Camuzzi Gazometri SpA. (12.75%), Grupo CG Argentina (7.65%%), and seven other groups (each holding less than 4%). Only $1 million was paid in cash and the remaining $19.8 million were paid in debt papers. In 2003, Camuzzi filed a claim against the Argentinean government with an international arbitration tribunal (International Centre for Settlement of Investment Disputes - ICSID). Camuzzi claims compensation for losses in its investments in electricity transmission and distribution in Argentina due to frozen rates and devaluation of the currency. For updates on the international arbitration proceedings, check http://www.worldbank.org/icsid (case # ARB/03/7). The seven other groups consisted of Sociedad Cooperativa Popular Ltda. de Comodoro Rivadivia (2.55%), Cooperativa Electrica de Consumo y Vivienda Ltda. de Trelew (3.76%), Cooperativa Ltda. de Provision de Servicios Pcos. y Vivienda de Puerto Madryn (2%), Cooperativa de de Servicios Pcos. y Vivienda y Consumo de Rawson (1.2%), Cooperativa de Provision de Servicios Pcos. y Vivienda y Consumo 16 de Octubre Ltda. (0.1%), Cooperativa de Provision de Energia Electrica y Otros Servicios Pcos. y Vivienda de Gaiman Ltda. (0.2%), and Cooperativa de Agua Potable y Otros Servicios Publicos de Rada Tilly Ltda. (0.2%).

Original sector

Energy

Budget

Location

Country

Argentina

State

Santiago del Estero

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Water Supply and Storage, Power Generation (CCGT), Government, Commercial

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project