logo
ProjectClosed

TRANSPORT PROJECT

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The objective of the Transport Project of Albania is to reduce user costs on the Milot - Rreshen section of the Durres - Milot - Morine corridor and improve access for the hinterland population, to introduce innovation in road maintenance on a pilot basis, and to contribute to the development of the institutional framework and implementation of road safety activities throughout Albania. The Projec

Status
Closed
Sector
Road, Automotive, Seaport, Commercial, Government, Residential
Location
Albania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about TRANSPORT PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TRANSPORT PROJECT” is an infrastructure initiative in the Road sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Transport Project of Albania is to reduce user costs on the Milot - Rreshen section of the Durres - Milot - Morine corridor and improve access for the hinterland population, to introduce innovation in road maintenance on a pilot basis, and to contribute to the development of the institutional framework and implementation of road safety activities throughout Albania. The Project includes four components: (a) construction of the 26 kilometer section between Milot and Rreshen which involves the civil works and consultant supervision to undertake the construction of the three lots of the 26 kilometer Milot to Rreshen section of the Milot to Morine road corridor; (b) the introduction of output and performance based contracting in two pilot regions; (c) the road safety component, involving a mix of technical assistance and equipment; and (d) other necessary technical assistance and equipment which will include the following: (i) technical assistance to establish the maritime administration, implement the new port authority law, and prepare new maritime by-laws in conformity with EU standards; (ii) undertaking a sector specific fiduciary assessment to identify the necessary changes to undertake a SWAP type approach in the sector in future; (iii) technical assistance in best practice in highway engineering skills to the Project Implementation Team in GRD for a defined term; (iv) training; (v) limited office expenses for a transitional period; (vi) two vehicles for the PIT; (vii) road roughness measuring equipment to provide information for the asset management system; and (viii) equipment for counting/classifying motor vehicles on the network, to the same end.

Original sector

FY17 - Public Administration,FY17 - Transportation

Budget

Location

Country

Albania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Automotive, Seaport, Commercial, Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project