Transportation Safety Improvements - Fredericton
Sector: Education • Location: New Brunswick, Canada
Source: Infrastructure Canada
These projects make incremental improvements to the transportation system from a safety perspective: 1. Odell Roudabout: this project creates a safe pedestrian and active transportation crossing at the intersection of Waggoners/Rookwood and Odell Park. It also strengthens the connection between Odell Park and the Valley Trail/Trans Canada trail. 2. Maple Street at Douglas Ave Pedestrian Actuated s
- Status
- Closed
- Sector
- Education, Automotive, Car parking, Road, Government
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Transportation Safety Improvements - Fredericton
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | These projects make incremental improvements to the transportation system from a safety perspective: 1. Odell Roudabout: this project creates a safe pedestrian and active transportation crossing at the intersection of Waggoners/Rookwood and Odell Park. It also strengthens the connection between Odell Park and the Valley Trail/Trans Canada trail. 2. Maple Street at Douglas Ave Pedestrian Actuated signalized Crosswalk: This project encourages safe pedestrian movements by establishing a pedestrian activated lighted crosswalk at the intersection. 3. Forest Hill Road Pedestrian Actuated Signalized Crosswalk: this project encourages safe pedestrian movements by establishing a pedestrian activated lighted crosswalk that connects to an extension of a sidewalk noted above. This will provide a crosswalk at an important pedestrian desire line on a busy street. 4. Fulton Ave Trail Crossing Island: This project constructs a refuge island on Fulton Ave at the intersection of the Northside Trail. This project creates a safe refuge space for trail users while also signaling to vehicles that a crossing is present. 5. Downtown Street Restrictions and pedestrian improvements: These projects reduce the width of the street to provide pedestrians with better visibility and a shorter crossing distance. 6. All-Way Stop Control at Windsor St and Kings College Rd: This project changes the current regulatory configuration to a 4 way stop condition to improve pedestrian safety adjacent to the University of New Brunswick. |
Original sector | Active Transportation |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Education, Automotive, Car parking, Road, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Education projects in Canada
- University Of Calgary - Mackimmie Complex Civil And Landscape Redevelopment
- New Central Library & Library Plaza - LRT Encapsulation
- Menno Simons School Addition and Modernization
- Brandon University Renovations
- Eleanor W. Graham Middle School and Northrop Frye School
- University of Saskatchewan Spinks Addition
- StFX Varsity Drive Residences
- Calgary Composting Facility
