logo

Transportation Upgrades Phase 1

Sector: Water Supply and Storage • Location: Kingston, Ontario, Canada

Source: Dodge USA

Project
Closed

The Corporation requests Bids for the following work on the Project (the Work ), as more fully described in the documents indicated in IB.5: (a) 1750 cubic metres of earth excavation (b) 3720 square metres of surface course asphalt pavement (c) 2935 square metres of base course asphalt pavement (d) 3340 square metres of concrete sidewalk (e) 1425 metres of concrete curb (f) 8 me tres of storm sewe

Status
Closed
Sector
Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial
Location
Kingston, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Transportation Upgrades Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Transportation Upgrades Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Kingston, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Corporation requests Bids for the following work on the Project (the Work ), as more fully described in the documents indicated in IB.5: (a) 1750 cubic metres of earth excavation (b) 3720 square metres of surface course asphalt pavement (c) 2935 square metres of base course asphalt pavement (d) 3340 square metres of concrete sidewalk (e) 1425 metres of concrete curb (f) 8 me tres of storm sewer (g) Culvert replacement (h) Traffic signals preparation, including pole bases, conduits, etc. (...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Kingston

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project