Transportes Metropolitanos Roca (TMR)
Sector: Mass Transit • Location: Argentina
Source: World Bank Group
The Trainmet (now Metropolitano) consortium signed a concession contract to operate the Roca, San Martin and Belgrano South lines of the Buenos Aires Metropolitan Railway in March 1993. To prevent further deterioration of the Buenos Aires metropolitan railway network, the President had created a new state-owned corporation, FEMESA, in March 1990. It was soon prepared for privatization (via lease/c
- Status
- Failure
- Sector
- Mass Transit, Rail, Government, Manufacturing (Industrial)
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Transportes Metropolitanos Roca (TMR)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Cancelled |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Trainmet (now Metropolitano) consortium signed a concession contract to operate the Roca, San Martin and Belgrano South lines of the Buenos Aires Metropolitan Railway in March 1993. To prevent further deterioration of the Buenos Aires metropolitan railway network, the President had created a new state-owned corporation, FEMESA, in March 1990. It was soon prepared for privatization (via lease/concession contracts). FEMESA divided the network into 7 lines: Mitre, Sarmiento, Urquiza, Roca, San Martin, Belgrano North, and Belgrano South. The government called for bids under a 2-stage bidding process. Bids were decided on the basis of lowest subsidy required, and pre-awarded for all 7 lines in January 1993. Each concession contract is for 10 years with optional 10 year extensions. The government sets maximum tariffs and minimum service frequencies. Trainmet won the contract to operate the Roca, San Martin and Belgrano South lines. Trainmet comprises: Empresa Argentina de Construcciones, Ormas SA, Roman SA, DGT Electronica and 63 independent bus operators, along with train operators Jarts (Japan) and Bart (US) as partners. Tranmet set up the operator Transportes Metropolitanos Roca (TMR) for the Roca line. TMR took over on January 1, 1995. Since Metropolitano took over, passenger numbers have increased 52.4% increase on the Roca line. The Roca line is 252.5 km long. The line receives a subsidy from the government. In November 1999, the concession contract was extended to 2025; the government also approved an increase in the consumer fees of 129% in five years, which will finance the additional US$ 120 million investments (the train fares were expected to be firstly adjusted by June 2000). By 2003, the ownership structure of Metropolitano had changed so that private Argentinian investor Sergio Taselli and Ormas were the majority owners. In May 2007, President Nestor Kirchner canceled the concession contract of Metropolitano for the Belgrano and Roca railway lines citing failure to comply with contractual standards. The planning minister, Julio de Vido, said that the "Emergency Railway Operation Management Unit" would temporarily take control of running the two lines. The emergency unit was also in charge of the San Martín line. Jarts and Bart, originally listed as project sponsors, have been excluded as "sponsors" because they are partners for the project and because both are government affiliated. Empresa Argentina de Construcciones and Roman Maritima were removed as sponsors as the majority ownership as of 2003 comprised private Argentinian investor Sergio Taselli and Ormas. None |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Argentina |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Government, Manufacturing (Industrial) |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Argentina
- Construction and laying of temporary and definite railway lines including signaling and complementary works of 2 new stations (Buenos Aires elevated station and head station in Constitución) in Argentina
- Belgrano Freight Railway
- Retiro Railway Terminal
- Trenes de Buenos Aires (TBA)
- Buenos Aires Al Pacifico (BAP)
- Ferrocarril Mesopotamico (FMGU)
- Metrovias
- Constitucion Railway Terminal
