Transstroy Bhopal Biaora Tollways Private Limited
Active · India
Source: World Bank Group
In January 2012, Madhya Pradesh Road Development Corporation (MPRDC on behalf of National Highway Authority of India) ) signed a 30-year concession (including construction period of 2 years) with a consortium of Transstroy (India) Limited and OJSC Corporation Transstroy (Russia) for the strengthening, improvement,two-laning, operation and maintenance, and tolling of 105.6kms of Bhopal-Biaora sect
- Status
- Prospective
- Sector
- Road, Bridge, Government, Waste Processing and Treatment, Automotive, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Transstroy Bhopal Biaora Tollways Private Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In January 2012, Madhya Pradesh Road Development Corporation (MPRDC on behalf of National Highway Authority of India) ) signed a 30-year concession (including construction period of 2 years) with a consortium of Transstroy (India) Limited and OJSC Corporation Transstroy (Russia) for the strengthening, improvement,two-laning, operation and maintenance, and tolling of 105.6kms of Bhopal-Biaora section of National Highway-12 from km 316/100 to km 423.400,in the state of Madhya Pradesh. The project stretch passed through the districts of Bhopal, Sehore and Rajgarh. Under the contract, the consortium was responsible for the design, construction, finance, operation and maintenance,strengthening and widening the existing carriageway to 2-lane road The scope included construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections,interchanges, drains, etc.The expansion project, part of the MPRDC Highway Development Program, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. The proposed section on NH12 would connect NH3 which was an important national highway of the north-south corridor. The consortium of Transstroy (India) Limited (74%) and OJSC Corporation Transstroy (26%), established Transstroy Bhopal Biaora Tollways Private Limited, a special purpose vehicle, to implement the project. Details of the bidding were not available at the time of collection of this information. Government of India had sanctioned in-principle approval of US$ 28.2mn (INR 1408.5mn) for viability gap fund (VGF) grant. It may thus be inferred that the SPV may have won the tender through international competitive bidding, conducted by MPRDC, by requesting for the lowest upfront subsidy (viablity gap funding). There were 49 pre-qualified bidders for this project. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. Transstroy India would execute the EPC for the project. The project attained financial closure on 20th September 2012. The debt/equity ratio of the project (excluding grant if any) was 70/30. The estimated capital cost of the project at the time of financial closure was US$ 142.3mn (INR 7115.9mn @50 INR/USD). Financing comprised of 15-year term loan of US$ 100mn (INR 5000mn) and sponsor equity of US$ 42.3mn (INR 2115.9mn).The term loan had a repayment schedule of 49 quarterly installments and was priced at 12.25%. Loan was arranged by Bank of India, Central Bank of India, Corporation Bank, IIFCL and Union Bank of India. Construction on the project began in September 2012 and was expected to be completed by September 2014. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
