TransWest Express Transmission Project
The owner, status and timeline of this project. A free account opens every field.
Source: Siemens Energy
The TransWest Express Transmission Project is a 732-mile high-voltage interregional transmission system that will connect to the existing grid in Wyoming and Utah, as well as directly to the ISO Controlled Grid in southern Nevada. Siemens Energy has been selected to supply the high-voltage direct current (HVDC) technology for this project.
- Status
- Prospective
- Sector
- Residential, Power Transmission, Power Generation (CCGT)
- Location
- Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Siemens Energy
ConstructChat
Ask ConstructChat about TransWest Express Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The TransWest Express Transmission Project is a 732-mile high-voltage interregional transmission system that will connect to the existing grid in Wyoming and Utah, as well as directly to the ISO Controlled Grid in southern Nevada. Siemens Energy has been selected to supply the high-voltage direct current (HVDC) technology for this project. |
Location
Country | United States of America (USA) |
State | Wyoming |
Source
Source | Siemens Energy |
URL |
More Details
Record type | Project |
Sector | Residential, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
