Trapper Creek Bridge Replacement
Abandoned · Saskatchewan · Last reported Mar 2023
Source: Dodge USA
The major items of work for this tender include: Demolition and disposal of an existing standard two span timber bridge including removal of piles to 1.5 m below grade; Installation and backfill of two new 2400 mm diameter (2.8 mm W.T.) by 26 m long galvanized CSP culverts, or the following alternates: o Alternate #1: Two 2100 mm diameter by 26.84 m long reinforced concrete pipe culverts (Class 50
- Status
- Failure
- Sector
- Commercial, Forest Products and Packaging, Water Supply and Storage, Bridge, Cement, Waste Processing and Treatment, Road, Government
- Location
- Regina, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Trapper Creek Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | abandoned |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The major items of work for this tender include: Demolition and disposal of an existing standard two span timber bridge including removal of piles to 1.5 m below grade; Installation and backfill of two new 2400 mm diameter (2.8 mm W.T.) by 26 m long galvanized CSP culverts, or the following alternates: o Alternate #1: Two 2100 mm diameter by 26.84 m long reinforced concrete pipe culverts (Class 50-D); o Alternate #2: Two 2130 mm diameter by 26 m long Weholite HDPE culverts (RSC250). Excavatio... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Regina |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Forest Products and Packaging, Water Supply and Storage, Bridge, Cement, Waste Processing and Treatment, Road, Government |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
