logo
ProjectAbandoned

Trapper Creek Bridge Replacement

Abandoned · Saskatchewan · Last reported Mar 2023

Source: Dodge USA

The major items of work for this tender include: Demolition and disposal of an existing standard two span timber bridge including removal of piles to 1.5 m below grade; Installation and backfill of two new 2400 mm diameter (2.8 mm W.T.) by 26 m long galvanized CSP culverts, or the following alternates: o Alternate #1: Two 2100 mm diameter by 26.84 m long reinforced concrete pipe culverts (Class 50

Status
Failure
Sector
Commercial, Forest Products and Packaging, Water Supply and Storage, Bridge, Cement, Waste Processing and Treatment, Road, Government
Location
Regina, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Trapper Creek Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Trapper Creek Bridge Replacement” is an infrastructure initiative in the Commercial sector, located in Regina, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

abandoned

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The major items of work for this tender include: Demolition and disposal of an existing standard two span timber bridge including removal of piles to 1.5 m below grade; Installation and backfill of two new 2400 mm diameter (2.8 mm W.T.) by 26 m long galvanized CSP culverts, or the following alternates: o Alternate #1: Two 2100 mm diameter by 26.84 m long reinforced concrete pipe culverts (Class 50-D); o Alternate #2: Two 2130 mm diameter by 26 m long Weholite HDPE culverts (RSC250). Excavatio...

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Regina

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Forest Products and Packaging, Water Supply and Storage, Bridge, Cement, Waste Processing and Treatment, Road, Government

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project