Trapper Park Canal Enclosure Piping Project
Sector: Power Generation (CCGT) • Location: Logan, Utah, United States of America
Source: Dodge USA
Installing approximately 6,000 feet of pipe, ranging in diameter from 48 to 15 inches, to replace about 1.1 miles of the existing open canal. The project includes replacing the existing diversion structure at the Lower Logan River and installing concrete diversion boxes with gates at lateral and turnout locations for water management. The new diversion structure will feature an electric traveling
- Status
- Closed
- Sector
- Power Generation (CCGT), Cement, Car parking, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
- Location
- Logan, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Trapper Park Canal Enclosure Piping Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installing approximately 6,000 feet of pipe, ranging in diameter from 48 to 15 inches, to replace about 1.1 miles of the existing open canal. The project includes replacing the existing diversion structure at the Lower Logan River and installing concrete diversion boxes with gates at lateral and turnout locations for water management. The new diversion structure will feature an electric traveling screen and gate. As part of the project, power will be supplied to the diversion structure area. ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Logan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Cement, Car parking, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
