Treatment Plant Facilities – Various Projects
Sector: Commercial • Location: Georgia, United States of America (USA)
Source: Atlanta Watershed
The Primary Headhouse electrical and instrumentation systems at the Utoy Creek Water Reclamation Center (WRC) monitor and control the process equipment to treat wastewater. It has been determined that the equipment is outdated and no longer supported by the manufacturer. The goal of this project is to reduce the risk of failure due to a sewage spill or a safety hazard by replacing the equipment an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete / design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Primary Headhouse electrical and instrumentation systems at the Utoy Creek Water Reclamation Center (WRC) monitor and control the process equipment to treat wastewater. It has been determined that the equipment is outdated and no longer supported by the manufacturer. The goal of this project is to reduce the risk of failure due to a sewage spill or a safety hazard by replacing the equipment and providing the level of redundancy required to ensure that Utoy Creek WRC maintains its regulatory compliance. The scope of this project includes: Replacing and upgrading electrical switchgear and power distribution equipment, Replacing telemetry and process control system components, Replacing Series 100 modules in primary, Replacing input/output (I/O) panels, Installing additional workstations in the administrative conference room & ultraviolet (UV) building control room, Installing additional fibers |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
