logo

Treaty Oak 100-Megawatt Solar Project

Sector: Solar • Location: Arkansas, United States

Source: Arkansas Business

Project
Under Construction

Treaty Oak Clean Energy is constructing a 100-megawatt solar power array in Grant County, Arkansas, near a coal plant that is set to retire. The project aims to enhance grid reliability and replace some of the lost generation capacity from the retiring coal plant.

Status
Under Construction
Sector
Solar, Power Generation (CCGT)
Location
Arkansas, United States of America
Updated
22 Jul 2026
Source
Arkansas Business

ConstructChat

Ask ConstructChat about Treaty Oak 100-Megawatt Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Treaty Oak 100-Megawatt Solar Project” is an infrastructure initiative in the Solar sector, located in Arkansas, United States. Taiyo aggregates data on it from Arkansas Business.

Participants

Company

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Treaty Oak Clean Energy is constructing a 100-megawatt solar power array in Grant County, Arkansas, near a coal plant that is set to retire. The project aims to enhance grid reliability and replace some of the lost generation capacity from the retiring coal plant.

Original sector

Energy

Location

Country

United States of America (USA)

State

Arkansas

Source

Source

Arkansas Business

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project