logo

Tres Mesas 4 wind power plant

Sector: Commercial • Location: Mexico

Source: World Bank Group

Project
Active

The project entails the construction of a 96 MW solar PV power plant in Tamaulipas, Mexico. Sponsor of the project is Engie and covers the whole cost of $ 119.6 million. The period of the PPA is 15 years. The power purchase contract was signed in 2016 with CENACE, Mexico’s National Center for Energy Control. Vestas will install 24, 4 MW wind turbines Global Energy Services is the EPC contractor. F

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Solar, Wind, Raw Materials, Government
Location
Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tres Mesas 4 wind power plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tres Mesas 4 wind power plant” is an infrastructure initiative in the Commercial sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of a 96 MW solar PV power plant in Tamaulipas, Mexico. Sponsor of the project is Engie and covers the whole cost of $ 119.6 million. The period of the PPA is 15 years. The power purchase contract was signed in 2016 with CENACE, Mexico’s National Center for Energy Control. Vestas will install 24, 4 MW wind turbines Global Energy Services is the EPC contractor. Financial close took place on September 6, 2018. https://www.inframationgroup.com/info/info/latin-america-mexican-renewable-portfolio-sponsor-raise-usd-500m-debt http://www.services-ges.com/en/sala-de-prensa/detalle/ges-comienza-la-construccion-de-un-parque-eolico-de-96mw-en-mexico https://www.evwind.es/2019/03/22/engie-wind-farm-to-feature-first-150-m-vestas-wind-turbines-in-mexico/66511

Original sector

Energy

Budget

Location

Country

Mexico

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Solar, Wind, Raw Materials, Government

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project