Tres Mesas 4 wind power plant
Sector: Commercial • Location: Mexico
Source: World Bank Group
The project entails the construction of a 96 MW solar PV power plant in Tamaulipas, Mexico. Sponsor of the project is Engie and covers the whole cost of $ 119.6 million. The period of the PPA is 15 years. The power purchase contract was signed in 2016 with CENACE, Mexico’s National Center for Energy Control. Vestas will install 24, 4 MW wind turbines Global Energy Services is the EPC contractor. F
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Solar, Wind, Raw Materials, Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tres Mesas 4 wind power plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of a 96 MW solar PV power plant in Tamaulipas, Mexico. Sponsor of the project is Engie and covers the whole cost of $ 119.6 million. The period of the PPA is 15 years. The power purchase contract was signed in 2016 with CENACE, Mexico’s National Center for Energy Control. Vestas will install 24, 4 MW wind turbines Global Energy Services is the EPC contractor. Financial close took place on September 6, 2018. https://www.inframationgroup.com/info/info/latin-america-mexican-renewable-portfolio-sponsor-raise-usd-500m-debt http://www.services-ges.com/en/sala-de-prensa/detalle/ges-comienza-la-construccion-de-un-parque-eolico-de-96mw-en-mexico https://www.evwind.es/2019/03/22/engie-wind-farm-to-feature-first-150-m-vestas-wind-turbines-in-mexico/66511 |
Original sector | Energy |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Solar, Wind, Raw Materials, Government |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
