logo
ProjectClosed

Treyvaux Cabin / LVPH Architectes

One of 2,321 projects Taiyo tracks in Switzerland.

Source: ArchDaily

During the rest of the year, this installation is moved according to the needs of the agricultural operation. Hot water production is ensured by a heat pump water heater that draws energy from the photovoltaic solar installation. Wastewater is sent to the manure pit of the agricultural operation below. Heating is provided by the single wood stove located in the center of the house. In summer, the

Status
Closed
Sector
Raw Materials, Energy Storage, Water Supply and Storage, Power Transmission, Solar, Residential, Power Generation (CCGT), Cement, Commercial
Location
Switzerland
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Treyvaux Cabin / LVPH Architectes

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Treyvaux Cabin / LVPH Architectes” is an infrastructure initiative in the Raw Materials sector, located in Switzerland. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

During the rest of the year, this installation is moved according to the needs of the agricultural operation. Hot water production is ensured by a heat pump water heater that draws energy from the photovoltaic solar installation. Wastewater is sent to the manure pit of the agricultural operation below. Heating is provided by the single wood stove located in the center of the house. In summer, the south overhang protects against direct sunlight, and the 6 south-facing windows can be fully opened to cool the air during the night.Text description provided by the architects.The house is located on the heights of the municipality ofTreyvaux, on the agricultural domain of the owners. The choice to position the project in the center of the plot was decided for reasons related to the agricultural operation, the landscape character of the site, and the characteristics of the terrain. The entrance is via a walkway to the north.On the first level, the 2 bedrooms, bathroom, and utility room (reduced to the bare minimum) are organized around the entrance, staircase, and fireplace. Upstairs, the kitchen is centrally located, in perfect symmetry, while the living room and dining room are organized according to preferences. Wide benches extend this space towards the outside. In the south, the 6 windows slide into the facade thanks to a counterweight system, transforming this floor into a unique belvedere.Entirely made of wood, 7 frames ensure the structure of the facades, floor, and roof. It rests on 14 concrete pilings, minimizing the footprint of the house and integrating it into the steep slope of the land. The house is completely self-sufficient. Drinking water comes from a water source below the house. Electricity is generated by the 63 photovoltaic panels on the roof. Excess energy is stored in two batteries with a capacity of 10 kWh each. In winter, the production is supplemented by 12 additional panels installed on the ground.

Location

Country

Switzerland

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Raw Materials, Energy Storage, Water Supply and Storage, Power Transmission, Solar, Residential, Power Generation (CCGT), Cement, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project