logo

TRG EXPANSION

Sector: Seaport • Location: Brazil

Source: International Finance Corporation (IFC)

Project
Completed

Tecon Rio Grande S.A. (TRG or the company) was awarded a 25-year lease through a public tender in 1997 to expand and operate the container terminal (the “Terminal”) in the port of Rio Grande, Rio Grande do Sul, Brazil. The Terminal was the second Brazilian container facility to be privatized and is currently the second largest container terminal in Brazil, accounting for approximately 12% of the

Project Information FAQ

Project Information

4 Q
The project “TRG EXPANSION” is an infrastructure initiative in the Seaport sector, located in Brazil. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Tecon Rio Grande S.A. (TRG or the company) was awarded a 25-year lease through a public tender in 1997 to expand and operate the container terminal (the “Terminal”) in the port of Rio Grande, Rio Grande do Sul, Brazil. The Terminal was the second Brazilian container facility to be privatized and is currently the second largest container terminal in Brazil, accounting for approximately 12% of the country's total container movement. The proposed project is the expansion of the Terminal, and comprises civil works associated with building a third berth of 250 meters and improvements in the container stacking area, together with purchase of additional equipment, including two additional Post-Panamax gantry cranes, three rubber tired gantry cranes and seven trucks. The expansion will increase the annual capacity of the Terminal from 300,000 container-moves to about 525,000 container-moves, easing capacity constraints and allowing TRG to capture unmet demand for the Terminal’s services. This project would be the second one to be financed by IFC. In December 1998, IFC financing supported the purchase of four cranes, a 300-meter extension of an existing quay, and repair and upgrading of existing facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data