TRG EXPANSION
Sector: Warehouse • Location: Brazil
Source: International Finance Corporation (IFC)
Tecon Rio Grande S.A. (TRG or the company) was awarded a 25-year lease through a public tender in 1997 to expand and operate the container terminal (the “Terminal”) in the port of Rio Grande, Rio Grande do Sul, Brazil. The Terminal was the second Brazilian container facility to be privatized and is currently the second largest container terminal in Brazil, accounting for approximately 12% of the
- Status
- Closed
- Sector
- Warehouse, Seaport, Waste Processing and Treatment, Biomass, Road, Water Supply and Storage, Government, Manufacturing (Industrial), Residential, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about TRG EXPANSION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tecon Rio Grande S.A. (TRG or the company) was awarded a 25-year lease through a public tender in 1997 to expand and operate the container terminal (the “Terminal”) in the port of Rio Grande, Rio Grande do Sul, Brazil. The Terminal was the second Brazilian container facility to be privatized and is currently the second largest container terminal in Brazil, accounting for approximately 12% of the country''s total container movement. The proposed project is the expansion of the Terminal, and comprises civil works associated with building a third berth of 250 meters and improvements in the container stacking area, together with purchase of additional equipment, including two additional Post-Panamax gantry cranes, three rubber tired gantry cranes and seven trucks. The expansion will increase the annual capacity of the Terminal from 300,000 container-moves to about 525,000 container-moves, easing capacity constraints and allowing TRG to capture unmet demand for the Terminal’s services.This project would be the second one to be financed by IFC. In December 1998, IFC financing (a $31 million loan comprising an A-Loan of $7.5 million, a B-loan of $18 million and a C-Loan of $5.5 million) supported the purchase of four cranes, a 300-meter extension of an existing quay, and repair and upgrading of various facilities. |
Original sector | BB - Port and Harbor Operations |
Location
Country | Brazil |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Warehouse, Seaport, Waste Processing and Treatment, Biomass, Road, Water Supply and Storage, Government, Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
