logo

Triangle Expressway

Sector: Road • Location: North Carolina, United States of America

Source: Build America Bureau (BAB) Projects

Project
Credit Agreement Executed

The 18.8-mile Triangle Expressway serves the Research Triangle Park (RTP) region (including I-40) between Raleigh and Durham, as well as improves commuter mobility, accessibility and connectivity to the RTP employment center. The tolled highway comprises three sections:

Phase 1 - 2.8 miles of NC 540 from NC 54 to NC 55 near Morrisville, which was constructed by North Carolina Department of Transp

Project Information FAQ

Project Information

5 Q
The project “Triangle Expressway” is an infrastructure initiative in the Road sector, located in North Carolina, United States of America. Taiyo aggregates data on it from Build America Bureau (BAB) Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

credit agreement executed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 18.8-mile Triangle Expressway serves the Research Triangle Park (RTP) region (including I-40) between Raleigh and Durham, as well as improves commuter mobility, accessibility and connectivity to the RTP employment center. The tolled highway comprises three sections: Phase 1 - 2.8 miles of NC 540 from NC 54 to NC 55 near Morrisville, which was constructed by North Carolina Department of Transportation (NCDOT) with Surface Transportation Funds (STP) funds and opened to traffic in 2007 (but not tolled until August 2012), and 3.4 miles of NC 147 from I-40 south to the interchange with NC 540 (opened in December 2011 and tolled in January 2012) Phase 2 - 6.6 miles of NC 540 from the southern terminus of Phase 1 at NC 55 to U.S. 64 (opened and tolled in August 2012) Phase 3 - 6 miles of NC 540 from the southern terminus of Phase 2 at U.S. 64 to NC 55 Bypass near Holly Springs (opened in January 2013) Roadway and traffic conditions in the Tri Ex study area threatened to limit the region’s continuing economic development and growth. The Triangle Expressway accommodates growing demand, featuring a fully electronic tolling system designed to prevent significant traffic delays and improve corridor safety. The project improves commuter mobility, accessibility, and connectivity to the RTP employment center with an average expected travel time savings of 17 minutes per trip by 2030. The project is expected to generate approximately $811 million in total economic impact through the same time period. TIFIA financing allowed for the realization of these benefits with approximately 20 years sooner and with $388 million of cash flow interest cost savings compared to conventional financing methods.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data