logo

Triangulo Mineiro Road System Lot 1

Sector: Road • Location: Brazil

Source: World Bank Group

Project
Active

"This project involves the rehabilitation, modernization and expansion of Lot 1 of the Triângulo Mineiro Road System, located in the state of Minas Gerais, Brazil. The EPR Triângulo, a company of the EPR Group, a joint venture between the Equipav Group and the asset management company Perfin Infr, won a 30-year concession for this road infrastructure system back in August 2022. The total length of

Project Information FAQ

Project Information

4 Q
The project “Triangulo Mineiro Road System Lot 1” is an infrastructure initiative in the Road sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"This project involves the rehabilitation, modernization and expansion of Lot 1 of the Triângulo Mineiro Road System, located in the state of Minas Gerais, Brazil. The EPR Triângulo, a company of the EPR Group, a joint venture between the Equipav Group and the asset management company Perfin Infr, won a 30-year concession for this road infrastructure system back in August 2022. The total length of Lot 1 is 627.4km. This initiative is expected to generate more than 800 direct and indirect jobs in the region and it aims at improving traffic flow and ensuring user safety. The total amount to be invested in Lot 1 of Triângulo Mineiro Road System is $1062m (R$5.9bn) while the sponsor secured a $236m (R$1.3bn) through an issuance of incentivized debentures. The National Bank for Economic and Social Development of Brazil (BNDES) provided a BRL 187 million (USD 34 million) guarantee to the sponsor. This guarantee supported the issuance of the incentivized debentures in a public offering coordinated by Bradesco BBI and Santander. The financial close date is September 16th, 2024. " https://agenciagov.ebc.com.br/noticias/202409/concessao-de-rodovias-em-mg-capta-r-3-bi-em-debentures-com-apoio-do-bndes ; https://www.infrapppworld.com/update/bndes-supports-investment-of-us-236-million-in-triangulo-mineiro-highway-complex-concession ; https://hubdeprojetos.bndes.gov.br/en/projetos/Minas-Gerais-Highways-Triangulo-Mineiro-e-Sul-de-Minas/74b6528c-b578-11ea-9bf9-0242ac11002b ; https://www.globaltradealert.org/intervention/139833/loan-guarantee/brazil-bndes-provides-guarantee-to-epr-tringulo-for-financing-concessions-in-the-tringulo-mineiro-highway ; https://www.bnamericas.com/en/features/epr-raises-over-us200mn-to-invest-in-minas-gerais-highway-works ; https://www.bnamericas.com/en/features/epr-raises-over-us200mn-to-invest-in-minas-gerais-highway-works

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data