logo

Triangulo Mineiro Transmissora

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In December 2012, Consorcio Triangulo Mineiro, a partnership of the Brazilian pension fund FIP Caixa Milao (JBS company, 51%) and the state-owned company Furnas Centrais Eletricas S.A (49%), was awarded the contract to build and operate the 297-km transmission line Marimbondo II-Assis, located at the states of Sao Paulo and Minas Gerais (500 kV in capacity).

Besides Consorcio Triangulo Mineiro, o

Project Information FAQ

Project Information

5 Q
The project “Triangulo Mineiro Transmissora” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2012, Consorcio Triangulo Mineiro, a partnership of the Brazilian pension fund FIP Caixa Milao (JBS company, 51%) and the state-owned company Furnas Centrais Eletricas S.A (49%), was awarded the contract to build and operate the 297-km transmission line Marimbondo II-Assis, located at the states of Sao Paulo and Minas Gerais (500 kV in capacity). Besides Consorcio Triangulo Mineiro, only another bidder took part in the contest: the Spanish company Abengoa. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Triangulo Mineiro presented the lowest offer, a total value of US$ 14.9 million (BRL 29,01 million), 18,89% below the ceiling set by the regulatory agency. The concession contract was signed in August 2013, and the sponsors created the special purpose company Triangulo Mineiro Transmissora S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 108.2 million (BRL 361 million) in the project, financed with the sponsor's equity. Construction works commenced in April 2015 and were concluded by October 2016. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data