Triangulo Mineiro Transmissora

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In December 2012, Consorcio Triangulo Mineiro, a partnership of the Brazilian pension fund FIP Caixa Milao (JBS company, 51%) and the state-owned company Furnas Centrais Eletricas S.A (49%), was awarded the contract to build and operate the 297-km transmission line Marimbondo II-Assis, located at the states of Sao Paulo and Minas Gerais (500 kV in capacity).

Besides Consorcio Triangulo Mineiro, o

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Triangulo Mineiro Transmissora

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Triangulo Mineiro Transmissora” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2012, Consorcio Triangulo Mineiro, a partnership of the Brazilian pension fund FIP Caixa Milao (JBS company, 51%) and the state-owned company Furnas Centrais Eletricas S.A (49%), was awarded the contract to build and operate the 297-km transmission line Marimbondo II-Assis, located at the states of Sao Paulo and Minas Gerais (500 kV in capacity). Besides Consorcio Triangulo Mineiro, only another bidder took part in the contest: the Spanish company Abengoa. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Triangulo Mineiro presented the lowest offer, a total value of US$ 14.9 million (BRL 29,01 million), 18,89% below the ceiling set by the regulatory agency. The concession contract was signed in August 2013, and the sponsors created the special purpose company Triangulo Mineiro Transmissora S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 108.2 million (BRL 361 million) in the project, financed with the sponsor's equity. Construction works commenced in April 2015 and were concluded by October 2016. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2024-06-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project