Trichy Tollway Private Limited
Sector: Road • Location: India
Source: World Bank Group
In July 2006, National Highways Authority of India (NHAI) signed a 20 year concession agreement with Trichy Tollway Private Limited (TTPL) for the upgrade, operation and maintenance of the 92.75 km stretch on National Highway 45 (NH-45), between Ulundurpet and Padalur, in the southern state of Tamil Nadu. Under the agreement, TTPL was required to design, finance and widen the existing two-lane str
- Status
- Prospective
- Sector
- Road, Commercial, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Trichy Tollway Private Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In July 2006, National Highways Authority of India (NHAI) signed a 20 year concession agreement with Trichy Tollway Private Limited (TTPL) for the upgrade, operation and maintenance of the 92.75 km stretch on National Highway 45 (NH-45), between Ulundurpet and Padalur, in the southern state of Tamil Nadu. Under the agreement, TTPL was required to design, finance and widen the existing two-lane stretch to a four lane highway with paved shoulders in return for the right to collect tolls for 20 years. The concession term included the construction period of 30 months. This road expansion project was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. TTPL was a joint venture with equal ownership between Mumbai based Shroopji Pallonji Group and Malyasian IJM Berhad. The IJM consortium won the concession in an international competitive tender, conducted by NHAI, by bidding for the lowest grant of US$ 8.83 million. India’s highway development policy allowed ‘viability funding’ by NHAI to the tune of 40 percent of the capital costs as grant to the concessionaire, subject to competitive bidding. The total capital cost of the project was estimated at US$ 125 million. The project reached financial closure in November 2006. The debt was arranged by a consortium led by SBI Group. Construction work on the project began in November 2006 and was expected to be completed by April 2009. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited