Tricon Boston Consulting Limited (TBCL)
Sector: Automotive • Location: Sindh, Pakistan
Source: World Bank Group
The project involves the development of three 50MW wind farms in Sindh province, Pakistan. The projects are being jointly developed by the Sapphire Group and Bank Alfalah through Tricon Boston Consulting Limited (TBCL),, a special purpose vehicle (SPV). TBCL will develop, own and operate the 3x 50MW wind farm.
The total cost is estimated to be around $335 million. The Asian Development Bank, and
- Status
- Prospective
- Sector
- Automotive, Wind, Power Generation (CCGT), Raw Materials, Government
- Location
- Sindh, Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tricon Boston Consulting Limited (TBCL)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of three 50MW wind farms in Sindh province, Pakistan. The projects are being jointly developed by the Sapphire Group and Bank Alfalah through Tricon Boston Consulting Limited (TBCL),, a special purpose vehicle (SPV). TBCL will develop, own and operate the 3x 50MW wind farm. The total cost is estimated to be around $335 million. The Asian Development Bank, and the Islamic Development Bank have each committed to direct loans of $66 million, while DEG has committed to a $40 million loan. The International Finance Corporation is also providing a loan in amount of $ 75 million. Power from the project will be sold under a 20 year take-or-pay energy purchase agreement under a feed-in-tariff to Pakistan’s Central Power Purchasing Agency. https://ifcextapps.ifc.org/IFCExt/Pressroom/IFCPressRoom.nsf/0/1DBC78772B9E289B8525811E002F6659 https://ijglobal.com/articles/106318/ifc-to-finance-pakistans-largest-wind-farm |
Original sector | Energy |
Budget |
Location
Country | Pakistan |
State | Sindh |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Wind, Power Generation (CCGT), Raw Materials, Government |
Article published date | 2024-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
