Triconboston Wind Power Project
The status, timeline and source of this project. A free account opens every field.
Source: Asian Development Bank (ADB)
The project involves the construction, commissioning and operation of three 50 MW wind power projects located in Thatta District, Sindh Province, in the south of Pakistan (the projects). The projects are jointly being developed by the Sapphire Group, a well-respected conglomerate in Pakistan with business interests in textiles, food, and power (both thermal and renewables), and Bank Alfalah Limite
- Sector
- Road, Commercial, Power Generation (CCGT), Government, Geothermal, Wind
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Triconboston Wind Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction, commissioning and operation of three 50 MW wind power projects located in Thatta District, Sindh Province, in the south of Pakistan (the projects). The projects are jointly being developed by the Sapphire Group, a well-respected conglomerate in Pakistan with business interests in textiles, food, and power (both thermal and renewables), and Bank Alfalah Limited, Pakistan's sixth largest private bank (collectively the sponsors) through Triconboston Consulting Corporation, a special purpose vehicle (SPV). Following a competitive bid, Hydrochina Corporation was awarded the EPC contract (with General Electric to provide wind turbine generators). General Electric is also the O&M contractor. All three projects have same EPC and O&M contractors. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Pakistan |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Power Generation (CCGT), Government, Geothermal, Wind |
Article published date | 2025-01-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
