logo
Project

Triconboston Wind Power Project

The status, timeline and source of this project. A free account opens every field.

Source: Asian Development Bank (ADB)

The project involves the construction, commissioning and operation of three 50 MW wind power projects located in Thatta District, Sindh Province, in the south of Pakistan (the projects). The projects are jointly being developed by the Sapphire Group, a well-respected conglomerate in Pakistan with business interests in textiles, food, and power (both thermal and renewables), and Bank Alfalah Limite

Sector
Road, Commercial, Power Generation (CCGT), Government, Geothermal, Wind
Location
Pakistan
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Triconboston Wind Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Triconboston Wind Power Project” is an infrastructure initiative in the Road sector, located in Pakistan. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction, commissioning and operation of three 50 MW wind power projects located in Thatta District, Sindh Province, in the south of Pakistan (the projects). The projects are jointly being developed by the Sapphire Group, a well-respected conglomerate in Pakistan with business interests in textiles, food, and power (both thermal and renewables), and Bank Alfalah Limited, Pakistan's sixth largest private bank (collectively the sponsors) through Triconboston Consulting Corporation, a special purpose vehicle (SPV). Following a competitive bid, Hydrochina Corporation was awarded the EPC contract (with General Electric to provide wind turbine generators). General Electric is also the O&M contractor. All three projects have same EPC and O&M contractors.

Original sector

Energy

Procurement method

Budget

Location

Country

Pakistan

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Road, Commercial, Power Generation (CCGT), Government, Geothermal, Wind

Article published date

2024-10-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project