Trillium Boulevard Reconstruction
Sector: Government • Location: Mill Creek, Washington, United States of America
Source: Dodge USA
This project is intended to address the failing state of the paving on Trillium Blvd. Based on the pavement assessment performed in 2024, the asphalt has a Pavement Condition Index (PCI) of 9 to 20, which corresponds to failed pavement. This requires a complete re-build of the pavement along the road. This project will address the road between Highway 527 and Village Green Drive. The project will
- Status
- Prospective
- Sector
- Government, Commercial, Car parking, Manufacturing (Industrial), Road, Automotive
- Location
- Mill Creek, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Trillium Boulevard Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is intended to address the failing state of the paving on Trillium Blvd. Based on the pavement assessment performed in 2024, the asphalt has a Pavement Condition Index (PCI) of 9 to 20, which corresponds to failed pavement. This requires a complete re-build of the pavement along the road. This project will address the road between Highway 527 and Village Green Drive. The project will address a complete streets model, investigating the use of a separate bike path as well as upgrad... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mill Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Car parking, Manufacturing (Industrial), Road, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
