logo

Trimmu, Panjnad and Islam Barrages Improvement Project

Sector: Road • Location: Pakistan

Source: Asian Development Bank (ADB)

Project
Closed

1.Trimmu and Panjnad Barrages Project (TPBP) will rehabilitate and upgrade the Trimmu and Panjnad barrages on the Chenab River, which supply irrigation water to 1.74 million ha through six main canals. The project will (i) rehabilitate and upgrade the two barrages, and (ii) build institutional capacity in flood risk management. Trimmu barrage is located downstream of the confluence of Jhelum and C

Project Information FAQ

Project Information

5 Q
The project “Trimmu, Panjnad and Islam Barrages Improvement Project” is an infrastructure initiative in the Road sector, located in Pakistan. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

1.Trimmu and Panjnad Barrages Project (TPBP) will rehabilitate and upgrade the Trimmu and Panjnad barrages on the Chenab River, which supply irrigation water to 1.74 million ha through six main canals. The project will (i) rehabilitate and upgrade the two barrages, and (ii) build institutional capacity in flood risk management. Trimmu barrage is located downstream of the confluence of Jhelum and Chenab rivers. Its flood passing capacity (FPC) is reduced from originally 18,265 cubic meters per second (m3s-1) to 12,743 m3s-1. The project will enhance the FPC to 23,220 m3s-1. Panjnad barrage is located downstream of confluence point of Sutlej and Chenab rivers. The project will enhance the barrage's FPC originally, from 19,822 m3s-1 to 24,495 m3s-1.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data