Trinity Bridge Force Main Relocation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Trinity Bridge 6in Force Main Relocation -- The major work will consist of the (approximate) following: Installation of approximately 320 LF of HDPE by directional bore and open cut, asphalt paving repair, site clearing and excavation, grout and plug abandoned sewer line.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Government, Commercial
- Location
- Denton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Trinity Bridge Force Main Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Trinity Bridge 6in Force Main Relocation -- The major work will consist of the (approximate) following: Installation of approximately 320 LF of HDPE by directional bore and open cut, asphalt paving repair, site clearing and excavation, grout and plug abandoned sewer line. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Denton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Government, Commercial |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
