Trion Oil Development Project
The owner, status and timeline of this project. A free account opens every field.
Source: Offshore Energy
The Trion project in Mexican waters reached 56% completion at the end of the first quarter of 2026. Drilling of 24 subsea wells started in March 2026. Subsea equipment installation is on track for Q3 2026. The floating production unit (FPU) construction reached new milestones with hull structural fabrication completed and two 6,000-metric-ton topside modules lifted and installed. Floating storage
- Status
- Under Construction
- Sector
- Oil and Gas, LNG, Manufacturing (Industrial)
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- Offshore Energy
ConstructChat
Ask ConstructChat about Trion Oil Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Trion project in Mexican waters reached 56% completion at the end of the first quarter of 2026. Drilling of 24 subsea wells started in March 2026. Subsea equipment installation is on track for Q3 2026. The floating production unit (FPU) construction reached new milestones with hull structural fabrication completed and two 6,000-metric-ton topside modules lifted and installed. Floating storage and offloading structural block fabrication continued with the disconnectable turret mooring buoy largely complete. The project targets first oil in 2028. |
Original sector | Energy |
Location
Country | Mexico |
Source
Source | Offshore Energy |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, LNG, Manufacturing (Industrial) |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
