Trion Project
The owner, status and timeline of this project. A free account opens every field.
Source: Colitco
The Trion Project is an offshore oil development that progressed to 56% completion by the end of Q1 2026 and remains on budget. Drilling of 24 subsea wells commenced in March 2026, and two 6,000 metric ton topside modules were installed onto the Floating Production Unit (FPU). First oil is targeted in 2028.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Colitco
ConstructChat
Ask ConstructChat about Trion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Trion Project is an offshore oil development that progressed to 56% completion by the end of Q1 2026 and remains on budget. Drilling of 24 subsea wells commenced in March 2026, and two 6,000 metric ton topside modules were installed onto the Floating Production Unit (FPU). First oil is targeted in 2028. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Louisiana |
Source
Source | Colitco |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
