Triple H Wind Farm
Sector: Wind • Location: Highmore, South Dakota, United States
Source: The Energy Mix
The 250-megawatt Triple H wind farm project in South Dakota with 92 turbines was damaged by a thunderstorm with wind gusts over 130 mph on June 29, 2026. The storm caused damage to 20 turbines across this and the North Bend project, raising concerns about wind farm resilience to changing weather patterns.
- Status
- Under Construction
- Sector
- Wind, Raw Materials
- Location
- Highmore, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- The Energy Mix
ConstructChat
Ask ConstructChat about Triple H Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational with damage |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 250-megawatt Triple H wind farm project in South Dakota with 92 turbines was damaged by a thunderstorm with wind gusts over 130 mph on June 29, 2026. The storm caused damage to 20 turbines across this and the North Bend project, raising concerns about wind farm resilience to changing weather patterns. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Highmore |
Source
Source | The Energy Mix |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
