Triticum Agrivoltaic Power Plant
Sector: Solar • Location: Oberdorf am Lech, Germany
Source: SolarQuarter
The Triticum project is Germany's largest agrivoltaic power plant, integrating agricultural production with solar energy generation. Located in Oberdorf am Lech, it spans 28 hectares where wheat is cultivated beneath elevated photovoltaic modules mounted on advanced tracker systems. The project aims to demonstrate the coexistence of solar energy production and agriculture while improving land effi
- Status
- Under Construction
- Sector
- Solar, Raw Materials, Consumer Products, Power Generation (CCGT)
- Location
- Oberdorf am Lech, Germany
- Updated
- 22 Jul 2026
- Source
- SolarQuarter
ConstructChat
Ask ConstructChat about Triticum Agrivoltaic Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Triticum project is Germany's largest agrivoltaic power plant, integrating agricultural production with solar energy generation. Located in Oberdorf am Lech, it spans 28 hectares where wheat is cultivated beneath elevated photovoltaic modules mounted on advanced tracker systems. The project aims to demonstrate the coexistence of solar energy production and agriculture while improving land efficiency. |
Original sector | Energy |
Location
Country | Germany |
City | Oberdorf am Lech |
Source
Source | SolarQuarter |
URL |
More Details
Record type | Project |
Sector | Solar, Raw Materials, Consumer Products, Power Generation (CCGT) |
Article published date | 2025-12-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
