Türkiye: Green Industrial Zone Development
One of 2,377 projects Taiyo tracks in Türkiye.
Source: aiib
Türkiye’s OIZs face tightening environmental standards, water stress, and infrastructure gaps that constrain environmental compliance, expansion, and competitiveness. Shortcomings in wastewater treatment and basic supporting infrastructure limit operational efficiency and resilience. Addressing these constraints is essential to sustain industrial growth, safeguard competitiveness, and support Türk
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Power Generation (CCGT), Natural Gas, Government, Manufacturing (Industrial)
- Location
- Turkey
- Updated
- 19 Nov 2026
- Source
- aiib
ConstructChat
Ask ConstructChat about Türkiye: Green Industrial Zone Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Türkiye’s OIZs face tightening environmental standards, water stress, and infrastructure gaps that constrain environmental compliance, expansion, and competitiveness. Shortcomings in wastewater treatment and basic supporting infrastructure limit operational efficiency and resilience. Addressing these constraints is essential to sustain industrial growth, safeguard competitiveness, and support Türkiye’s green industrial transition. The Project supports the Government of Türkiye to improve the environmental sustainability and operational competitiveness of OIZs through targeted investments in (i) wastewater treatment and water reclamation systems, and (ii) essential supporting green infrastructure. The latter includes, as appropriate, domestic and process water networks, sewage lines, stormwater drainage systems, electricity distribution networks, natural gas networks, and telecommunications infrastructure. Climate-resilient design and green features, such as energy-efficient measures, renewable energy integration, and nature-based solutions will be incorporated where appropriate. Investment will support the development, upgrading and expansion of necessary infrastructure. The Project is structured as a parallel financing operation with the Islamic Development Bank (IsDB), under a coordinated nation-wide program led by the Ministry of Industry and Technology (MoIT). AIIB and IsDB will finance separate groups of OIZs under their respective policies and procedures. The Project is organized along the following components: Component A: Investment in Wastewater and Water Reclamation Facilities (USD 190 million) Component B: Investment in Green and Climate-Resilient Basic Infrastructure (USD 55 million) Component C: Project Management (USD 5 million) |
Original sector | Urban |
Budget |
Location
Country | Turkey |
Source
Source | aiib |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Power Generation (CCGT), Natural Gas, Government, Manufacturing (Industrial) |
Article published date | 2026-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
