Troback Water Tower Project Phase 1
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
This project is for the design of a new water reservoir and upgrades to an existing water main in the Village of Telkwa (Village). An access road, security fencing, SCADA control and monitoring system will also be designed. The design stage of the project also includes surveying, a geotechnical investigation and environmental overview assessment.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Troback Water Tower Project Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is for the design of a new water reservoir and upgrades to an existing water main in the Village of Telkwa (Village). An access road, security fencing, SCADA control and monitoring system will also be designed. The design stage of the project also includes surveying, a geotechnical investigation and environmental overview assessment. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
