logo

Trofa Town Hall / NOARQ

Sector: Government • Location: Portugal

Source: ArchDaily

Project
Closed

Text description provided by the architects.The rehabilitation and the extension of the former “Indústria Alimentar Trofense” buildings into theTrofaCity Hall. Trofa is the youngest municipality in Portugal and was the only one that did not have an institutional building. For more than 25 years, the City Council occupied scattered spaces in the city, in a precarious situation. The building site is

Project Information FAQ

Project Information

3 Q
The project “Trofa Town Hall / NOARQ” is an infrastructure initiative in the Government sector, located in Portugal. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.The rehabilitation and the extension of the former “Indústria Alimentar Trofense” buildings into theTrofaCity Hall. Trofa is the youngest municipality in Portugal and was the only one that did not have an institutional building. For more than 25 years, the City Council occupied scattered spaces in the city, in a precarious situation. The building site is in the south of the urban centre. An incomplete and old area of the city. occupied by an Industrial complex.The result is a building with 6.700 sqm a footprint of 1.996 sqm and a maximum height of 17.14 m. The building is a synthesis. The budget was limited. Public buildings are not properly maintained. Maintenance is expensive and is not sustainable. The essential can resist the time. Each element is a structural entity, whose subtraction compromises the whole. Materials and construction technologies were selected based on durability, energy efficiency, low maintenance requirements and constructive economy.The first parallelepiped is used for the longitudinal circulation in the building. Two more blocks on each of the tops of the old building constitute the central mass of the City Hall, where all the municipal services are located. The third parallelepiped attached to the west façade has lost its configuration to integrate the old building and to preserve its dialogue with the landscape. It is a space, the public space, allowing visual contact between the different levels.The fourth block, located on the south top, has the same role and the same free space. The fifth in the underground is for parking, technical services, and storage.The plot covers 6,200.85 sqm. Is a strip measuring 28 by 200 meters parallel to the abandoned railway line. The reuse of the industrial complex required a considerable increase in area and an underground floor. We decided to preserve just the seminal building. The new building proposal reduces itself to a series of 5 juxtaposed narrow parallelepipeds divided into 3 floors.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data