logo
ProjectFinancial Close

Troissereux Bypass PPP project

The owner, status and timeline of this project. A free account opens every field.

Source: InfraPPPWorld

The project will be carried out on finance, design, build, maintain and operate basis. This 25 year PPP contract is structured on an availability basis with payments from the Département de l'Oise.The project involves the construction of a 7-km section of 2-lane road, 4 engineering structures as well as a 275-meter long cut-and-cover tunnel.

Status
Closed
Sector
Tunnel, Rail, Road
Location
France
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Troissereux Bypass PPP project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Troissereux Bypass PPP project” is an infrastructure initiative in the Tunnel sector, located in France. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Company

Status

Original status

financial close

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will be carried out on finance, design, build, maintain and operate basis. This 25 year PPP contract is structured on an availability basis with payments from the Département de l'Oise.The project involves the construction of a 7-km section of 2-lane road, 4 engineering structures as well as a 275-meter long cut-and-cover tunnel.

Original sector

Transport

Procurement method

Budget

Location

Country

France

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Tunnel, Rail, Road

Article published date

2025-03-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project