Troll B Gas Wells Development
The owner, status and timeline of this project. A free account opens every field.
Source: Energy Watch
Equinor plans to invest NOK 7 billion to accelerate gas production from the Troll field by bringing three new gas wells on stream at Troll B in 2029. The Troll license is shared by Equinor, Petoro, Shell, Total, and ConocoPhillips.
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Norway
- Updated
- 19 Nov 2026
- Source
- Energy Watch
ConstructChat
Ask ConstructChat about Troll B Gas Wells Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Equinor plans to invest NOK 7 billion to accelerate gas production from the Troll field by bringing three new gas wells on stream at Troll B in 2029. The Troll license is shared by Equinor, Petoro, Shell, Total, and ConocoPhillips. |
Original sector | Oil & Gas |
Budget |
Location
Country | Norway |
Source
Source | Energy Watch |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-08-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
