logo
ProjectClosed

TROMBAY POWER EXT PR

Closed · India

Source: World Bank Group

The Trombay Thermal Power Station Expansion Project provides finance for the addition of a third thermal generating unit, similar in characteristics to the two units now nearing completion, in the Trombay station located on the northeast shore of Bombay harbor. The unit will have a maximum capacity of 62,500 kw in a 50 cycle turbo-generator supplied with steam from a 6000,000 lb/hr boiler. Operati

Status
Closed
Sector
Power Generation (CCGT), Oil and Gas, Seaport, Geothermal, Government, Hydro
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about TROMBAY POWER EXT PR

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TROMBAY POWER EXT PR” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Trombay Thermal Power Station Expansion Project provides finance for the addition of a third thermal generating unit, similar in characteristics to the two units now nearing completion, in the Trombay station located on the northeast shore of Bombay harbor. The unit will have a maximum capacity of 62,500 kw in a 50 cycle turbo-generator supplied with steam from a 6000,000 lb/hr boiler. Operation will be at 1250 lb per square inch pressure and at 950 degrees temperature. The plant will be equipped with coal crushing and handling equipment and will primarily use domestic coal from Central India. It will also be equipped to burn fuel oil and by-products from the adjacent Stanvac oil refinery. The latter fuel is now used in the original plant. The project is estimated to cost the equivalent of 14 million. The Bank has been requested to finance the foreign exchange cost, estimated at the equivalent of $9.8 million inclusive of interest during construction. The loan will be for a period of 18 years including a grace period on amortization payments of approximately 3 years. The project, which should be completed in April 1960, will help meet a continuing shortage of power which is particularly acute in the Bombay area pending construction of a large hydro development at Koyna.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Seaport, Geothermal, Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project