logo

TROMBAY POWER EXT PR

Sector: Power Generation (CCGT) • Location: India

Source: World Bank Group

Project
Closed

The Trombay Thermal Power Station Expansion Project provides finance for the addition of a third thermal generating unit, similar in characteristics to the two units now nearing completion, in the Trombay station located on the northeast shore of Bombay harbor. The unit will have a maximum capacity of 62,500 kw in a 50 cycle turbo-generator supplied with steam from a 6000,000 lb/hr boiler. Operati

Project Information FAQ

Project Information

5 Q
The project “TROMBAY POWER EXT PR” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Trombay Thermal Power Station Expansion Project provides finance for the addition of a third thermal generating unit, similar in characteristics to the two units now nearing completion, in the Trombay station located on the northeast shore of Bombay harbor. The unit will have a maximum capacity of 62,500 kw in a 50 cycle turbo-generator supplied with steam from a 6000,000 lb/hr boiler. Operation will be at 1250 lb per square inch pressure and at 950 degrees temperature. The plant will be equipped with coal crushing and handling equipment and will primarily use domestic coal from Central India. It will also be equipped to burn fuel oil and by-products from the adjacent Stanvac oil refinery. The latter fuel is now used in the original plant. The project is estimated to cost the equivalent of 14 million. The Bank has been requested to finance the foreign exchange cost, estimated at the equivalent of $9.8 million inclusive of interest during construction. The loan will be for a period of 18 years including a grace period on amortization payments of approximately 3 years. The project, which should be completed in April 1960, will help meet a continuing shortage of power which is particularly acute in the Bombay area pending construction of a large hydro development at Koyna.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data