TROMBAY POWER EXT PR
Sector: Power Generation (CCGT) • Location: India
Source: World Bank Group
The Trombay Thermal Power Station Expansion Project provides finance for the addition of a third thermal generating unit, similar in characteristics to the two units now nearing completion, in the Trombay station located on the northeast shore of Bombay harbor. The unit will have a maximum capacity of 62,500 kw in a 50 cycle turbo-generator supplied with steam from a 6000,000 lb/hr boiler. Operati
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Trombay Thermal Power Station Expansion Project provides finance for the addition of a third thermal generating unit, similar in characteristics to the two units now nearing completion, in the Trombay station located on the northeast shore of Bombay harbor. The unit will have a maximum capacity of 62,500 kw in a 50 cycle turbo-generator supplied with steam from a 6000,000 lb/hr boiler. Operation will be at 1250 lb per square inch pressure and at 950 degrees temperature. The plant will be equipped with coal crushing and handling equipment and will primarily use domestic coal from Central India. It will also be equipped to burn fuel oil and by-products from the adjacent Stanvac oil refinery. The latter fuel is now used in the original plant. The project is estimated to cost the equivalent of 14 million. The Bank has been requested to finance the foreign exchange cost, estimated at the equivalent of $9.8 million inclusive of interest during construction. The loan will be for a period of 18 years including a grace period on amortization payments of approximately 3 years. The project, which should be completed in April 1960, will help meet a continuing shortage of power which is particularly acute in the Bombay area pending construction of a large hydro development at Koyna. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
