TRP Expansion
Completed · Argentina
Source: International Finance Corporation (IFC)
Terminales Rio de la Plata S.A. (“TRP” or the “Company”), an existing IFC client, operates an international container facility in the port of Buenos Aires under a 25-year concession awarded in 1994 and ending in 2019. The Company operates three finger piers, in which there are 8 Quay Cranes, in an area of 43.5 hectares (depth of 9.8m). TRP handles containers, break bulk, vehicles as well as crui
- Status
- Closed
- Sector
- Seaport, Automotive, Commercial, Government
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about TRP Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Terminales Rio de la Plata S.A. (“TRP” or the “Company”), an existing IFC client, operates an international container facility in the port of Buenos Aires under a 25-year concession awarded in 1994 and ending in 2019. The Company operates three finger piers, in which there are 8 Quay Cranes, in an area of 43.5 hectares (depth of 9.8m). TRP handles containers, break bulk, vehicles as well as cruise passengers through its operation of the “Benito Quinquela Martín” Cruise Terminal which handles all cruise traffic in the Port of Buenos Aires. TRP does not handle dry (i.e. grain, coal) or liquid (i.e. hydrocarbons) bulk cargo. Over the last years, the number of cruise ships calling Buenos Aires has increased from 65 in 2004/2005 to 141 in the 2009/2010 season resulting in increased passenger traffic in the terminal building from 66,000 to more than 336,000. Given the sustained growth of the cruise traffic in Buenos Aires, TRP is investing to refurbish the cruise passenger terminal and improve the service provided to its cruise passengers. At the same time with the objective of reducing congestion in the berthing of ships that occurs during the peak season, TRP is modifying the layout of one of the piers. This will allow TRP to better support their clients in the Cruise business, improve efficiency of its overall operation and deliver a higher value service to passengers and shipping lines. Under the proposed project, IFC would help TRP finance (i) the modification of one of the Company’s piers; and (ii) the refurbishment of the cruise terminal building. Upon completion, TRP will increase its ability to simultaneously berth the largest cruise ships in a separate area of the terminal. Additionally, the new cruise terminal building will be able to handle 480,000 passengers per season with an improved level of service. TRP is 55.624% controlled by Dubai Ports World (“DPW”) that is one of the largest marine terminal operators in the world, with 49 terminals and 12 new developments across 31 countries. IFC has a long-standing relationship with DPW and has invested in 2 of DPW’s terminals (Caucedo in Dominican Republic and Sokhna in Egypt), which have been compliant with IFC’s applicable environmental and social standards. |
Original sector | BB - Port and Harbor Operations |
Procurement method |
Location
Country | Argentina |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Seaport, Automotive, Commercial, Government |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
