Truman Middle School Renovation
Sub bidding, construction documents · Missouri · Last reported Oct 2024
Source: Dodge USA
Phase 1 of the project consists of the removal of the existing pool and locker rooms and new locker room improvements as well as temporary classrooms for the school to occupy during future construction phases - Scopes of work includes concrete material, rebar, lumber, roofing, architectural sheet metal, firestopping, joint sealants, glass & glazing, ceramic tile, resilient flooring, markerboards,
- Status
- Closed
- Sector
- Metal, Forest Products and Packaging, Steel, Commercial, Cement, Government, Education, Car parking, Automotive
- Location
- St. Louis, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Truman Middle School Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1 of the project consists of the removal of the existing pool and locker rooms and new locker room improvements as well as temporary classrooms for the school to occupy during future construction phases - Scopes of work includes concrete material, rebar, lumber, roofing, architectural sheet metal, firestopping, joint sealants, glass & glazing, ceramic tile, resilient flooring, markerboards, signage, toilet accessories, fire protection specialties, lockers, horizontal louver blinds. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | St. Louis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Forest Products and Packaging, Steel, Commercial, Cement, Government, Education, Car parking, Automotive |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
