Trump's proposed Triumphal Arch
Sector: Airport • Location: Washington, District of Columbia, United States
Source: AOL
President Trump's 250-foot proposed Triumphal Arch in Washington, D.C., features a 166-foot mezzanine, a 24-foot observation level, and a 60-foot statue of Lady Liberty. The project requires structural revisions to comply with the 1910 Heights of Buildings Act, which limits building heights to 130 feet to preserve the skyline. The National Planning Commission suggested reducing the mezzanine and o
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | preliminary approval with required revisions |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | President Trump's 250-foot proposed Triumphal Arch in Washington, D.C., features a 166-foot mezzanine, a 24-foot observation level, and a 60-foot statue of Lady Liberty. The project requires structural revisions to comply with the 1910 Heights of Buildings Act, which limits building heights to 130 feet to preserve the skyline. The National Planning Commission suggested reducing the mezzanine and observation levels to 130 feet and 20 feet respectively, allowing the statue to be 100 feet tall while maintaining the overall height of 250 feet. The arch has faced public criticism and concerns about its impact on Arlington Cemetery and nearby airport flight paths. The commission preliminarily approved the plans with stipulations for revisions on pedestrian accessibility, lighting, and FAA aeronautical study. Construction is planned to be intensive, with 20 hours a day over two years, using concrete finished with granite. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
