logo

Trump's proposed Triumphal Arch

Sector: Airport • Location: Washington, District of Columbia, United States

Source: AOL

Project
Preliminary Approval With Required Revisions

President Trump's 250-foot proposed Triumphal Arch in Washington, D.C., features a 166-foot mezzanine, a 24-foot observation level, and a 60-foot statue of Lady Liberty. The project requires structural revisions to comply with the 1910 Heights of Buildings Act, which limits building heights to 130 feet to preserve the skyline. The National Planning Commission suggested reducing the mezzanine and o

Project Information FAQ

Project Information

3 Q
The project “Trump's proposed Triumphal Arch” is an infrastructure initiative in the Airport sector, located in Washington, District of Columbia, United States. Taiyo aggregates data on it from AOL.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

preliminary approval with required revisions

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

President Trump's 250-foot proposed Triumphal Arch in Washington, D.C., features a 166-foot mezzanine, a 24-foot observation level, and a 60-foot statue of Lady Liberty. The project requires structural revisions to comply with the 1910 Heights of Buildings Act, which limits building heights to 130 feet to preserve the skyline. The National Planning Commission suggested reducing the mezzanine and observation levels to 130 feet and 20 feet respectively, allowing the statue to be 100 feet tall while maintaining the overall height of 250 feet. The arch has faced public criticism and concerns about its impact on Arlington Cemetery and nearby airport flight paths. The commission preliminarily approved the plans with stipulations for revisions on pedestrian accessibility, lighting, and FAA aeronautical study. Construction is planned to be intensive, with 20 hours a day over two years, using concrete finished with granite.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data