Trunkline LNG Lake Charles Terminal, Louisiana

Sector: Commercial • Location: United States

Source: Hydrocarbon Technology

Project
Closed

Southern Union, a Houston-based natural gas company, completed the Infrastructure Enhancement Project (IEP) of its Trunkline LNG terminal in March 2010. Situated in Lake Charles, Louisiana, it is the biggest import terminal in the US. The terminal is operated by Trunkline LNG and its capacity is fully contracted to BG LNG Services until 2030. The IEP added ambient air vaporisation units and

Project Information FAQ

Project Information

4 Q
The project “Trunkline LNG Lake Charles Terminal, Louisiana” is an infrastructure initiative in the Commercial sector, located in United States. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Southern Union, a Houston-based natural gas company, completed the Infrastructure Enhancement Project (IEP) of its Trunkline LNG terminal in March 2010. Situated in Lake Charles, Louisiana, it is the biggest import terminal in the US. The terminal is operated by Trunkline LNG and its capacity is fully contracted to BG LNG Services until 2030. The IEP added ambient air vaporisation units and a natural gas liquids (NGL) extraction plant to the terminal. Southern Union announced the $430m Trunkline project in April 2006. With the completion of the project, the terminal became the first such facility in the US to use AVU technology. Construction and infrastructure Southern Union received approval to carry out the IEP in December 2006 and construction activities began in February 2007. About 33.1 acres of land were required for the IEP. The project added four AVUs to help increase fuel efficiency and generate cost savings. Construction of the NGL facility added processing facilities for LNG conditioning. The NGL facility will help in extracting butane, propane, ethane and other heavier hydrocarbons from the LNG. It will also help BG widen its LNG supply sources and import LNG from various locations. Other facilities added as part of the project included 64 air heaters and two 1,160ft, 12in diameter product piping for ethane and propane, two propylene glycol heaters and a glycol storage and a circulation system. In addition, two electrical switchgear buildings, one remote instrumentation building and a foam building were added to the existing facilities. Southern Union also expanded the existing electric substation and a meter station. Two 18 mile take-away pipelines from the NGL were also constructed. The two pipelines include a 10in diameter ethane pipeline and a 6in diameter propane pipeline. Trunkline contractors Mustang Engineering was awarded the engineering, procurement and construction contract and provided its LNG Smart Vaporisation process technology for the project. BG hired PetroLogistics to design, construct and operate the meter station and the two pipelines. The pipelines extend from the meter station at the terminal to PetroLogistics storage facility in Louisiana. Developments at Lake Charles Construction of the Trunkline LNG terminal began in 1978 over a 382 acre site near Lake Charles. Construction was completed in 1981 with a send-out capacity of 630mcf per day, 6.3bcf per day of storage and three LNG storage tanks. Since its construction, the Trunkline LNG terminal has been expanded in two phases. The IEP was supplemental to these expansions. Phase I began in 2002 and expanded the send-out capacity to 1.2bcf per day and peak send-out capacity to 1.5bcf per day. A second ship berth and a fourth LNG storage tank were also constructed. Installation of the LNG tank increased the terminal storage capacity to 9bcf per day. The phase I expansion was completed in April 2006. The second phase of expansion, which started in 2003, boosted the send-out capacity to 1.8bcf per day and the peak send-out capacity to 2.1bcf per day. Phase II also included the addition of unloading facilities at the plant. The expansion was completed in July 2006. Trunkline technology The AVUs installed at the terminal use Mustang Engineering’s LNG Smart Vaporisation process to regasify the LNG. The process uses heat from the air to warm an intermediate fluid (potassium formate), which converts LNG into natural gas. This process helps to reduce the hydrocarbon fuel required to regasify the LNG. The vaporisation technology is environmentally friendly because it does not use hydrocarbon fuel to heat water and regasify the LNG. This in turn reduces air emissions. The four new AVUs are the primary vaporisers for the plant. The existing 14 submerged combustion vaporisers, however, have been retained to enable operations when weather conditions are not conducive for use of the ambient-air technology.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data