TRWWTP Plant Electrical Engineering Evaluation
One of 10,000+ projects Taiyo tracks in Michigan.
Source: Dodge USA
Plant Electrical Engineering Evaluation per Task 4 of 2018-2019 Facility's Priority Plan-Upgrade per evaluation to be added to CIP in Accordance with AMP prioritization. This project may be incorporated into project 904-22-CIP CWSRF WWTP Headworks and Primary Treatment Upgrade. The City of Traverse City may be seeking a consultant to provide Electrical Engineering Evaluation for the TRWWTP Plant p
- Status
- Prospective
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Traverse City, Michigan, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about TRWWTP Plant Electrical Engineering Evaluation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Plant Electrical Engineering Evaluation per Task 4 of 2018-2019 Facility's Priority Plan-Upgrade per evaluation to be added to CIP in Accordance with AMP prioritization. This project may be incorporated into project 904-22-CIP CWSRF WWTP Headworks and Primary Treatment Upgrade. The City of Traverse City may be seeking a consultant to provide Electrical Engineering Evaluation for the TRWWTP Plant project. |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Traverse City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
