TSA Training Room Upgrade
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The contractors shall furnish, install, program, test, document, and train TSA personnel on turnkey operational and integrated Electronic Access Control System (EPACS), Entry Door Locks and Hardware, Intermediate Distribution Frame (IDF) IT Wall Mount Cabinets, Fiber Optics Cabling, and the Time Clock. All project work is more particularly described in the GSA Specifications. All of the work shall
- Status
- Closed
- Sector
- Broadband, Commercial, Rail, Government, Airport, Telecommunications, Education
- Location
- Bishop, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about TSA Training Room Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractors shall furnish, install, program, test, document, and train TSA personnel on turnkey operational and integrated Electronic Access Control System (EPACS), Entry Door Locks and Hardware, Intermediate Distribution Frame (IDF) IT Wall Mount Cabinets, Fiber Optics Cabling, and the Time Clock. All project work is more particularly described in the GSA Specifications. All of the work shall be in accordance with all applicable Federal, State, and local laws, codes, and regulations. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bishop |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Commercial, Rail, Government, Airport, Telecommunications, Education |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
