Tsentrenergo Biomass Boiler Replacement Project
Sector: Biomass • Location: Kyiv, Ukraine
Source: Inkorr
The project aims to replace the coal boiler at Tsentrenergo with a biomass boiler of 250 MW capacity. However, the project faces critical challenges due to the lack of sufficient biomass raw materials and logistical difficulties in supply. The project requires up to 800 thousand tons of biomass annually, which is not feasible given current biomass production and supply constraints in Ukraine.
- Status
- Prospective
- Sector
- Biomass
- Location
- Kyiv, Ukraine
- Updated
- 22 Jul 2026
- Source
- Inkorr
ConstructChat
Ask ConstructChat about Tsentrenergo Biomass Boiler Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project aims to replace the coal boiler at Tsentrenergo with a biomass boiler of 250 MW capacity. However, the project faces critical challenges due to the lack of sufficient biomass raw materials and logistical difficulties in supply. The project requires up to 800 thousand tons of biomass annually, which is not feasible given current biomass production and supply constraints in Ukraine. |
Original sector | Energy |
Budget |
Location
Country | Ukraine |
City | Kyiv |
Source
Source | Inkorr |
URL |
More Details
Record type | Project |
Sector | Biomass |
Article published date | 2025-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in Ukraine
- OAK Waste-to-Energy Plant
- AGRI-INFRASTRUCTURE AND BIOMASS POWER GENERATION
- UKRAINE MUNICIPAL INFRASTRUCTURE PROGRAMME
- Ivankiv Biomass Power Plant Phase I
- Smela Biomass Power Plant II
- Globino Biogas Power Plant
- Renewable sources of energy - method of improvng the qualityn of natural enviroment within the area of the Lubaczow district and Jaworów region
- Rokytne Biopower Project
