TSET High School Trail Construct
Sector: Water Supply and Storage • Location: Cushing, Oklahoma, United States of America
Source: Dodge USA
The Work consists generally of the following: 1. Protect trees during construction 2. Site Preparation, including demolition, excavation and backfill, removal of and debris as noted on the plans. 3. Perform rough and fine grading. 4. Construct concrete sidewalks, trails and low water crossing. 5. Provide and Install trail signs 6. Provide and install benches, bike racks and bollards 7. Provide and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Work consists generally of the following: 1. Protect trees during construction 2. Site Preparation, including demolition, excavation and backfill, removal of and debris as noted on the plans. 3. Perform rough and fine grading. 4. Construct concrete sidewalks, trails and low water crossing. 5. Provide and Install trail signs 6. Provide and install benches, bike racks and bollards 7. Provide and install tinhorn. 8. Provide and install sod. 9. Provide and install lighting 10. Provide and ins... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
