Tskaltubo Water and Wastewater Project

One of 6,815 projects Taiyo tracks in Georgia.

Source: European Bank for Reconstruction and Development (EBRD)

The EBRD is considering providing a €1.5 million loan to Georgia to finance urgently needed water supply and wastewater improvements in Tskaltubo. At present the City has 2 hours of water supply per day, and wastewater is discharged untreated into open drainage canals. The project will restore reliable water supply and rehabilitate proper wastewater handling. Institutional aspects such as commerci

Status
Closed
Sector
Water Supply and Storage, Government, Residential, Power Transmission, Power Generation (CCGT), Commercial, Waste Processing and Treatment
Location
Georgia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Tskaltubo Water and Wastewater Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tskaltubo Water and Wastewater Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Georgia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The EBRD is considering providing a €1.5 million loan to Georgia to finance urgently needed water supply and wastewater improvements in Tskaltubo. At present the City has 2 hours of water supply per day, and wastewater is discharged untreated into open drainage canals. The project will restore reliable water supply and rehabilitate proper wastewater handling. Institutional aspects such as commercialisation of the water utility would also be addressed to ensure future sustainability of the water supply operations. The operation is part of a framework to address water rehabilitation needs in several cities in Georgia. In conjunction with the physical investments, the Bank works closely with the Water Supply Regional Development Agency to provide institution building support to the water sector. TCs 4 and 5 below cover the entire water sector. The Georgian water sector is presently undergoing reform. The country’s water companies are being merged into three regional companies. The Tskaltubo Water Company has recently become part of the West Water Company. The organisational structure of Tskaltubo’s former water company is now a local service centre. Transition impact of the project will be at regional level, with additional assistance to improved service provision at local level. The transition impact will likely be achieved through: The Bank is highly additional as long term financing from commercial banks is not available in Georgia at the current time. By combining its loan with capital grants, the Bank will facilitate implementation of the important investment programme within affordability constraints. The EBRD loan would be provided to Georgia and on-lent to the West Regional Water Company for investments in Tskaltubo. The proposal is for a loan of €1.5 million to Georgia on-lent to the West Water Company. The total project cost is estimated to be up to €9.0 million. While the Bank would lend €1.5 million, a capital investment grant of €5 million and TC grants of €1.2 million for pre-signing and post-signing TC support are considered from international donors. In addition, there would be a €1.3 million local contribution. Screened B in accordance with EBRD's 2008 Environmental and Social Policy. The project will improve efficiency of water supply and wastewater collection in Tskaltubo, thus providing uninterrupted access to safe drinking water, preventing pollution of the watercourses and improving public health. The environmental and social due diligence is on-going and will include a review of the existing feasibility reports to assess the Company's current environmental and social management systems and the Company's past and current performance against EBRD's Performance Requirements (PRs), and an environmental and social analysis of any potential environmental and social impacts and benefits of the priority investment programme (PIP). An Environmental and Social Action Plan will be prepared and agreed with the Company to address any environmental and social issues identified during the due diligence to achieve and maintain compliance with the Bank's PRs within a reasonable time-frame. The Client will develop a Stakeholder Engagement Plan, including a grievance mechanism, and will release information on environmental and social performance and a summary of the agreed Action Plan to stakeholders. This PSD will be updated when the results of due diligence are known. Four technical co-operation assignments will support project and institutional development as follows: Pre-signing Post-signing

Original sector

Municipal Infrastructure

Location

Country

Georgia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Residential, Power Transmission, Power Generation (CCGT), Commercial, Waste Processing and Treatment

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project