TTU Teaching Headhouse Renovation
Sector: Raw Materials • Location: Cookeville, Tennessee, United States of America
Source: Dodge
Approx 2,497 sq ft renovation to the classroom building of the Headhouse at Shipley Farm. Interior and exterior walls to be demolished with existing structure and roof to remain. New work to consist of a classroom, CNC room, and headhouse work room with new restrooms for the building
- Status
- Closed
- Sector
- Raw Materials, Fertilizers, Commercial, Education
- Location
- Cookeville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about TTU Teaching Headhouse Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Approx 2,497 sq ft renovation to the classroom building of the Headhouse at Shipley Farm. Interior and exterior walls to be demolished with existing structure and roof to remain. New work to consist of a classroom, CNC room, and headhouse work room with new restrooms for the building |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Cookeville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Fertilizers, Commercial, Education |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
